This site is in testing phase. The configurator and other features may not work correctly. If you found an error, please let us know.

Installation and commissioning

Certified installation teams, technical supervision, and commissioning checklists for controlled delivery quality.

Result

System starts correctly on day one and performs as designed.

Timeline

Apartments/houses: 5-15 days. Commercial projects: per approved schedule.

Included scope

  • Installation works according to approved project documentation
  • Certified crews with safety and site discipline
  • Daily QA photo control and progress reporting
  • Pressure tests, balancing, and startup procedures
  • Final commissioning protocol and client briefing

Cycle stage: 3/4

How the service is delivered

What is shown

This block shows our approach to installation and startup: delivery and site preparation, installation of equipment and ductwork, and system commissioning before handover to the client.

How the stage works

The stage starts with organizing the works on site: delivery of materials and equipment, preparation of installation zones, setup of scaffolding, lifting machinery, and supporting infrastructure where required. The exact preparation scope depends on the type of facility, access conditions, and safety requirements.

After preparation, installation works are carried out according to the design, technical requirements, and safety standards. Installation of equipment, ductwork, supports, connections, and related nodes is performed by competent teams under supervision and with quality control throughout the process.

Commissioning is a separate stage. Highly qualified specialists check system operating modes, perform the required adjustments, tune the equipment, and prepare the startup report for final handover to the client.

This approach helps move from site preparation to system startup in a controlled, safe, and predictable way.

Installation from delivery to commissioning. A brief look at the main installation stages: material delivery, equipment and duct installation, and commissioning.VIDEO
Installation from delivery to commissioning

A brief look at the main installation stages: material delivery, equipment and duct installation, and commissioning.

Installation of ventilation equipment on site with access to service zones.PHOTO 01
Equipment

Equipment installation, connection, and access checks for service zones.

Installation of air ducts and support nodes on site.PHOTO 02
Ductwork

Routing preparation and duct installation according to working documentation.

Commissioning of the ventilation system after installation is completed.PHOTO 03
Startup

Commissioning, airflow balancing, and operating parameter checks.

Discuss your project

Leave your contact and we will get back to discuss the right solution for your project.

Other cycle stages

Each service is delivered in one cycle: audit, design, implementation, launch, and support.