Design, installation, and commissioning of canteen ventilation at a plant: a 600 m³/h VENTS supply and exhaust system with heat recovery, automation, and reheating.

Location: Kyiv.Category: industrial

Installation photo report

Technical node of a grille branch connection into the duct, showing the mounting details.Photo 01
Installation of two levels of rectangular air ducts with a double-row adjustable grille.Photo 02
Installation of a rectangular steel duct of the supply ventilation system in the dining hall.Photo 03
Supply air duct with two single-row grilles after installation and balancing.Photo 04
Fragment of the main duct with Prana grilles and mounting nodes beneath the canteen ceiling.Photo 05
Technical installation details

Brief execution notes:

For the canteen at a concrete products plant in Kyiv, design, installation, and commissioning of the ventilation system were completed. A VENTS supply and exhaust system rated at 600 m³/h with heat recovery, automation, and reheating was implemented. The system was tuned for stable air exchange in the canteen.

  • Project: canteen at a concrete products plant.
  • Location: Kyiv.
  • Ventilation: VENTS supply and exhaust system, 600 m3/h.
  • Heat recovery: included.
  • Reheating: included.
  • Automation: included.
  • Scope: design, installation, commissioning.