Warehouse in Polohy-Chobitky: four 10 kW cassette split systems for heating and cooling

Design, installation, and commissioning of the warehouse heating and cooling system: semi-industrial cassette split air conditioners operating on R32, efficient air heating at outdoor temperatures down to -22°C, and four air conditioners with 10 kW of heating capacity each.

Location: Kyiv Oblast, Polohy-Chobitky.Category: industrial

Installation photo report

Row of Cooper&Hunter outdoor units installed by Ventall on steel stands along the building facade.Photo 01
Ventall specialist on scaffolding installing a large ducted air-conditioning unit suspended from the concrete ceiling.Photo 02
Cassette indoor air-conditioning unit fixed to a steel I-beam at the Polohy-Chobitky medical center.Photo 03
Cassette air-conditioning unit with drain and refrigerant lines connected, fixed to the steel ceiling frame.Photo 04
Side view of a cassette air-conditioning unit with insulated copper lines and a drain system connected.Photo 05
Technical installation details

Brief execution notes:

For the warehouse, design, installation, and commissioning of a heating and cooling system based on semi-industrial cassette split air conditioners were completed. The system operates on R32 refrigerant and is designed for both heating and cooling. The equipment is adapted for air heating at outdoor temperatures down to -22°C. Four air conditioners with 10 kW heating capacity each were installed.

  • Project: warehouse.
  • Configuration: semi-industrial cassette air conditioners, split system.
  • Operating modes: heating and cooling.
  • Refrigerant: R32.
  • Heating operating range: down to -22°C.
  • Quantity and capacity: four air conditioners, 10 kW heating capacity each.
  • Total heating capacity: 40 kW.
  • Scope: design, installation, commissioning.