School in Kniazhychi: 6,000 m³/h shelter ventilation built from Aerostar components

Design, installation, and commissioning of supply and exhaust ventilation for a school basement used as a temporary shelter: system capacity 6,000 m³/h to supply air for a room intended for long stays by children. The system is assembled from AEROSTAR components.

Location: Kniazhychi, Kyiv Oblast.Category: commercial

Installation photo report

Supply and exhaust units and duct network on the facade of the school in Kniazhychi.Photo 01
Facade of the three-storey school building in Kniazhychi, where Ventall upgraded the shelter ventilation.Photo 02
Network of foil-insulated ventilation ducts in the classroom area of the school shelter in Kniazhychi, installed by Ventall.Photo 03
Classroom in the shelter of the school in Kniazhychi with an exposed ventilation duct system installed by Ventall.Photo 04
Rectangular galvanized-steel main duct with a ventilation grille in the school shelter in Kniazhychi.Photo 05
Technical installation details

Brief execution notes:

For the school basement in Kniazhychi used as a temporary shelter, design, installation, and commissioning of a supply and exhaust ventilation system were completed. The implemented 6,000 m³/h system provides air supply and exhaust for a space intended for long stays by children. The engineering solution is assembled from AEROSTAR components.

  • Project: school basement used as a temporary shelter.
  • Location: Kniazhychi, Kyiv Oblast.
  • Ventilation: supply and exhaust, 6,000 m3/h.
  • Purpose: air supply for a space intended for long stays by children.
  • System components manufacturer: AEROSTAR.
  • Scope: design, installation, commissioning.